Road Projects

  1. Asphalt overlay package 2017-3 – Repair portions of Kickapoo, Kermier, Hegar, and Katy Hockley Cut Off Road
  2. John Paul Landing – North Bank Channel Excavation & Central Cell Pedestrian Bridge
  3. Grant Road from Lakewood Forest to Old Kluge - Construction of a 4-lane boulevard
  4. Telge Road from Spring Cypress to Little Cypress Creek - Construction of a 4-lane boulevard
  5. Cypress Rose Hill from 0.5 miles north of channel M128 to Seidel Cemetery – Construction of a 4-lane boulevard
  6. Mueschke Road from Grand Parkway to 2700’ South of Draper – Construction of a 4-lane boulevard
  7. Asphalt Overlay package Pitts – Repair portions of Pitts Road from South of Clay Road to FM 529
  8. Cypress Rose Hill Road from Grand Parkway to 0.5 miles north of Channel M128 - Construction of a 4-lane boulevard

Traffic Projects (Intersection & Signal)

  1. Sidewalk along Greenhouse Road – Construct Sidewalk along Greenhouse Road from Langham Creek North to Town Lake Greene Drive
  2. Park Row at Primewest Parkway – Construction of a traffic signal system
  3. Mason at Franz – Intersection improvement project to construct dual left turn lanes on the northbound and southbound approaches and right turn lanes on the eastbound and westbound approaches
  4. Morton Ranch at Elrod (North) – Construction of a traffic signal system
  5. Cypresswood at Louetta – Construction of a traffic signal system

Projects Completed in the Last Six Months

  1. Mueschke from Juergen to Grand Parkway - Construction of a 4-lane boulevard
  2. Addicks Clodine from Alief Clodine to Westpark - Remove and replace damaged pavement
  3. Barker Cypress at Morton/Groschke – intersection improvement project to add northbound dual left turn lane
  4. Fry Road at Chilton Bluff/Maircopa Ridge – Construction of a traffic signal system
  5. Westgreen Blvd at Park Row Dr – Intersection improvement project to add longer left turn lanes and a westbound right turn lane
  6. Clay Road from Deerfield Village to Pine Forest Green – Overlay, drainage and safety improvements
  7. Fry at Stockton Falls/CannonFire - construction of a traffic signal system
  8. Morton Ranch at Elrod (South) – construction of a traffic signal system
  9. Fry at Clay Rd. - Intersection improvement project to add longer left turn lanes and a southbound right turn lane
  10. Mason at Clay - Left turn lane extension and median nose repair
  11. Asphalt overlay package 2017-2 - Repair portions of Becker Road, Bauer Hockley Road, Roberts Road, and Betka Road
  12. Decker Prairie Rosehill Bridge - Bridge erosion repair project
  13. Clay from Wood Pine to Barker Cypress – Widen 4-lane bridge
  14. West Little York from Westfield Creek to Eagle Sky - Construction of future east bound lanes to complete a 4-lane boulevard
  15. Telge at Tuckerton - reconstruction of existing Telge Road pavement, adding northbound and southbound right turn lanes and an eastbound dual left turn along with related signal modifications

For suggestions or comments regarding this site please email us at webmaster@pct3.com. For employee access to Outlook click here.

The information contained in this site was valid at the time of posting. Harris County assumes no liability for damages incurred directly or indirectly as a result of errors, omissions or discrepancies.
Moreover, Harris County is not responsible for the content nor endorses any site which has a link from this page.
For additional information please review our Privacy Policy and our Accessibility Statement.