Road Projects

  1. Subdivision Asphalt Pavement Replacement (Package 2 – Hockley Area) – Repair portions of Kermier, Warren Ranch Road, Bell Street, James Street, Camby Street, Austin Street, Warren Street, Walker Street, Old Washington County Road and San Felipe
  2. Asphalt Package 2018-3 Repairs to Bauer Road and Roberts Cemetery Road and portions of Waller Tomball Road and Bauer Hockley Road
  3. Asphalt Package 2018-1 – Repair portions of Jarvis Road, Juergen Road, Old Mueschke Road, Huffmeister Road, Cypress North Houston, and Mile Drive
  4. John Paul Landing – North Bank Channel Excavation & Central Cell Pedestrian Bridge
  5. Grant Road from Lakewood Forest to Old Kluge - Construction of a 4-lane boulevard
  6. Telge Road from Spring Cypress to Little Cypress Creek - Construction of a 4-lane boulevard
  7. Porter Road from Franz to 0.5 miles north of Franz – Reconstruct 2-lane roadway
  8. Porter Road from 0.5 miles north of Franz to Morton Ranch – Reconstruct 2-lane roadway
  9. Mueschke Road from Grand Parkway to 2700’ South of Draper – Construction of a 4-lane boulevard
  10. Cypress Rose Hill Road from Grand Parkway to 0.5 miles north of Channel M128 - Construction of a 4-lane boulevard
  11. Cypress North Houston from Cypress Creek bend to Greenhouse – Construct 2-lanes to complete 4-lane boulevard
  12. Asphalt Package 2019-1 – Repairs portions of Field Store Road, Stokes Road, and Waller Spring Creek Road

Traffic Projects (Intersection & Signal)

  1. Bellaire Boulevard at Marchena Drive – Construction of a traffic signal system

Projects Completed in the Last Six Months

  1. West Road at Telge Road – Intersection improvement project to construct eastbound dual left turn lanes and southbound dual left turn lanes
  2. Cypress North Houston Road at Cypress Creek Bend Drive – Construction of a traffic signal system
  3. Greenhouse at Cypress Bay – Construction of a traffic signal system
  4. Mason at Cumberland Ridge/Schiel – Construction of a traffic signal system
  5. Mason at Katybriar – Construction of a traffic signal system
  6. Asphalt Package 2018-4 – Repair portions of Baker Road, Saums Road, Dulaney Road, Groschke Road, Ashley Road, Old Greenhouse Road, Pine Forest Road and Clay Road.
  7. Asphalt Package 2018-2 – Repair portions of Elrod, Katy Gap Road, Katy Hockley Cut Off Road, Roesner Road, and Old Fry Road.
  8. Mason at Franz – Intersection improvement project to construct dual left turn lanes on the northbound and southbound approaches and right turn lanes on the eastbound and westbound approaches

For suggestions or comments regarding this site please email us at webmaster@pct3.com. For employee access to Outlook click here.

The information contained in this site was valid at the time of posting. Harris County assumes no liability for damages incurred directly or indirectly as a result of errors, omissions or discrepancies.
Moreover, Harris County is not responsible for the content nor endorses any site which has a link from this page.
For additional information please review our Privacy Policy and our Accessibility Statement.